Yeah, thankfully. Most of the people we contacted said they couldn't fit us in before mid-January (that was before Christmas), but then we found someone who said they would get us a fire and start work on December 22nd. They finished the job on Christmas Eve and were completely brilliant =D
I'm still sleeping on the lounge floor though - I'm not allowed to sleep in my room as the insurance company says the ceiling has to be replaced =( That means I have to take EVERYTHING out of my room, and as there's nowhere else to put it all, everything I don't need has to go into storage (as well as most of the other stuff in the house as we need re-wiring and new windows and we've got TOO MUCH STUFF!) I'm trying to clear the box room so I can sleep in there, even though it's damp it will be better than an inflatable mattress on the floor! Trouble is, there's enough wool in there to start a wool shop, so it's taking some clearing!
no subject
I'm still sleeping on the lounge floor though - I'm not allowed to sleep in my room as the insurance company says the ceiling has to be replaced =(
That means I have to take EVERYTHING out of my room, and as there's nowhere else to put it all, everything I don't need has to go into storage (as well as most of the other stuff in the house as we need re-wiring and new windows and we've got TOO MUCH STUFF!) I'm trying to clear the box room so I can sleep in there, even though it's damp it will be better than an inflatable mattress on the floor! Trouble is, there's enough wool in there to start a wool shop, so it's taking some clearing!